课程咨询

雅思备考规划

扫码添加助教免费咨询雅思备考规划

扫码关注回复雅思获取最新雅思口语题库和备考资料

雅思阅读模拟练习题:示意图题(6)

2015-07-22 12:14:43来源:网络 柯林斯词典

  新东方在线雅思网特为大家准备了雅思阅读模拟练习题:示意图题(6)。雅思模拟试题在雅思备考过程中所起的作用不可小觑,通过模拟练习题,我们可以很直接地了解到自己的备考状况,从而可以更有针对性地进行之后的复习。希望以下内容能够对大家的雅思备考有所帮助!更多雅思报名官网的最新消息,最新、最专业的雅思备考资料,新东方在线雅思网将第一时间为大家发布。

  Tidal Power

  Undersea turbines which produce electricity from the tides are set to become an important source of renewable energy for Britain. It is still too early to predict the extent of the impact they may have, but all the signs are that they will play a significant role in the future

  A

  Operating on the same principle as wind turbines, the power in sea turbines comes from tidal currents which turn blades similar to ships’ propellers, but, unlike wind, the tides are predictable and the power input is constant. The technology raises the PROSPECT of Britain becoming self-sufficient in renewable energy and drastically reducing its carbon dioxide emissions. If tide, wind and wave power are all developed, Britain would be able to close gas, coal and nuclear power plants and export renewable power to other parts of Europe. Unlike wind power, which Britain originally developed and then abandoned for 20 years allowing the Dutch to make it a major industry, undersea turbines could become a big export earner to island nations such as Japan and New Zealand.

  B

  Tidal sites have already been identified that will produce one sixth or more of the UK’s power-and at prices competitive with modern gas turbines and undercutting those of the already ailing nuclear industry. One site alone, the Pentland Firth, between Orkney and mainland Scotland, could produce 10% of the country’s electricity with banks of turbines under the sea, and another at Alderney in the Channel Islands three times the 1,200 megawatts of Britain’s largest and newest nuclear plant, Sizewell B, in Suffolk. Other sites identified include the Bristol Channel and the west coast of Scotland, particularly the channel between Campbeltown and Northern Ireland.

  C

  Work on designs for the new turbine blades and sites are will advance at the University of Southampton’s sustainable energy research group. The first station is expected to be installed off Lynmouth in Devon shortly to test the technology in a venture jointly funded by the department of Trade and Industry and the European Union. AbuBakr Bahaj, in charge of the Southampton research, said: ‘The prospects for energy from tidal currents are far better than from wind because the flows of water are predictable and constant. The technology for dealing with the hostile saline environment under the sea has been developed in the North Sea oil industry and much is already known about turbine blade design, because of wind power and ship propellers. There are a few technical difficulties, but I believe in the next five to ten years we will be installing commercial marine turbine farms.’ Southampton has been awarded £215,000 over three years to develop the turbines and is working with Marine Current Turbines, a subsidiary of IT power, on the Lynmouth project. EU research has now identified 106 potential sites for tidal power, 80% round the coasts of Britain. The best sites are between islands or around heavily indented coasts where there are strong tidal currents.

  D

  A marine turbine blade needs to be only one third of the size of wind generator to produce three times as much power. The blades will be about 20 metres in diameter, so around 30 metres of water is required. Unlike wind power, there are unlikely to be environmental objections. Fish and other creatures are though unlikely to be at risk from the relatively slow-turning blades. Each turbine will be mounted on a tower which will connect to the national power supply grid via underwater cables. The towers will stick out of the water and be lit, to warn shipping, and also be designed to be lifted out of the water for maintenance and to clean seaweed from the blades.

  E

  Dr Bahaj has done most work on the Alderney site, where there are powerful currents. The single undersea turbine farm would produce far more power than needed for the Channel Islands and most would be fed into the French Grid and be re-imported into Britain via the cable under the Channel.

  F

  One technical difficulty is cavitation, where low pressure behind a turning blade causes air bubbles. These can cause vibration and damage the blades of the turbines. Dr Bahaj said: ‘We have to test a number of blade types to avoid this happening or at least make sure it does not damage the turbines or reduce performance. Another slight concern is submerged debris floating into the blades. So far we do not know how much of a problem it might be. We will have to make the turbines robust because the sea is a hostile environment, but all the signs that we can do it are good.’


为你特别匹配的雅思超值课程,祝你和雅思分手!
  • 新东方11月雅思公开讲座

    新东方雅思11月公开讲座

    新东方教师直播教你全科技巧!

    每天1小时

    查看详情
  • 雅思机考实战

    雅思机考实战

    剑桥雅思正版题目机考实战!

    每天1小时

    查看详情
  • 【知心雅思】6分录播课 (A类)

    【知心雅思】6分录播课 (A类)

    适合人群:想要冲6分的考生

    课时:434

    查看详情
  • 【知心雅思】6.5分录播课 (A类)

    【知心雅思】6.5分录播课 (A类)

    适合人群:想要冲6.5分的考生

    课时:464

    查看详情
  • 【知心雅思】7分录播课 (A类)

    【知心雅思】7分录播课 (A类)

    适合人群:想要冲7分的考生

    课时:443

    查看详情
雅思备考资料包

扫码添加助教

免费获取雅思备考资料包

更多资料
更多>>
更多内容

移动学习

二维码

2024年9月-12月雅思口语题库

扫码即可免费领取最新雅思口语题库
更多>>
更多公开讲座>>

2024年雅思考试机经

扫码免费领取【雅思考试机经】

考试机经
更多>>
更多资料